How IPLAS solved the low efficiency problem at BMZ Poland?

See how IPLAS helped BMZ Poland identify downtime, use production-line data and improve process efficiency.

In brief

See how IPLAS helped BMZ Poland identify downtime, use production-line data and improve process efficiency.

BMZ Poland

A company manufacturing batteries and accumulators for power tools, electric bicycles, cars and buses. Production at BMZ Poland involves many different projects, carried out on lines consisting of several to a dozen workstations (operated manually by employees), which form a production flow ending with the manufacture and quality control of the finished product or semi-finished product.

znak-zapytania.svg

PROBLEM: production efficiency too low / underutilisation of resources available in the production process.

The customer tried to solve the low efficiency problem by verifying the assumed optimal cycle times or changing the crew size on the line, but the results were still unsatisfactory.

Imagine a large aquarium full of leaks – to maintain the correct water level, you have to constantly top it up. That was the case here. The customer had to put in a huge amount of effort to keep production at a level that was profitable. Adding more resources, even human ones, did not mean an increase in efficiency. This had to change!

SOLUTION: implementation of the IPLAS production monitoring and optimisation system.

The implemented IPLAS system allowed for precise observation of what is happening on the production lines. Thanks to data acquisition from finished product testers, we launched real-time reporting, which presented the progress and performance indicators of the process on an ongoing basis.1

IPLAS production monitoring report for BMZ Poland

The customer was able to accurately locate where problems occurred, their duration, and finally identify the causes, which made it possible to take the right steps in optimising the entire process. Currently, the hourly output and downtime on one of the selected lines are as follows:

Hourly output and downtime report for a BMZ Poland production line

Monika Nowak
Author and subject-matter consultant

Monika Nowak

iPLAS Project Director

Monika is responsible for designing the iPLAS system with a strong focus on user-friendliness, ensuring intuitive interface design and a seamless user experience. She values direct client feedback, which helps her tailor solutions to real-world operational needs. In her free time, she enjoys an active lifestyle and thrilling suspense novels.
iPLAS for manufacturing

Turn production data into confident decisions.

Connect machines, operators and systems in one place — from OEE and downtime to energy, quality and traceability.